Friday, December 28, 2007

Hallway Tile

The tile is 95% finished in the hallways. We weren't able to continue the hardwood flooring through these hallways because they are located on a cement slab. 3/4" plywood would have had to be place down before the 3/4" hardwoods were installed. This increase in height would have forced the stairs out of code. Anyway, we selected a tile that should tie in nicely with the wood floors. Once the hardwood is down the remaining trim tiles will be installed.

Laundry Room Cabinets

The laundry room is really starting to shape up nicely. The laundry cabinets are all installed and look great. The counter top still needs to be cut out so the wash sink can be installed The only other thing we are waiting on is the arrival (and installation) of the washer and dryer. Our contractor pointed out one small oops -- one of the larger cabinet doors actually hits one of the ceiling lights. Small oversight and something we are going to live with.

Wednesday, December 5, 2007

Along the tile road

After struggling with decision of what tile to put on the walls (that will remain for a long time!) for the first floor bathroom, we finally came to a decision. We picked a porcelain tile family that matched what we were looking for. The floor has a 13"x13" varied colored tile, which matches the 8"x8" on the walls of the tub/shower surround. We then selected a matching 2"x2" border flanked on both the top and bottom by a 1"x2" trim. The tile color contrasted nicely with the bisque tub and soap dishes. Master Bath is next!